Permit on power operation
PERMIT ON POWER OPERATION
-
No. 848/GP-BCN dated 09/3/2005 issued by the Ministry of Industry.
-
Change of registration (1st time): No.1659/GP-BCN dated 14/5/2007 issued by the Ministry of Industry
-
Effective duration: by 31/10/2014.
-
Scope and range of operation.
+ Consulting for preparation of investment projects on hydroelectric plants with max. installation capacity of 100MW. Place of operation: Nationwide
+ Consulting for design and bidding for projects regarding hydroelectric plants with max. installation capacity of 30MW. Place of operation: Nationwide
+ Consulting for preparation of investment projects, design, bidding for power transmission line and power station with max. installation capcity of 110KV. Place of operation: Nationwide
+ Consulting for supervision, execution of hydroelectric plants with max. installation capacity of 30MW. Place of operation: Nationwide
+ Consulting for supervision, execution of hydroelectric plants with max. installation capacity of 110KV. Place of operation: Nationwide
Permit on power operation