Permit on power operation


PERMIT ON POWER OPERATION  
 
  • No. 848/GP-BCN dated 09/3/2005 issued by the Ministry of Industry.
  • Change of registration (1st time): No.1659/GP-BCN dated 14/5/2007 issued by the Ministry of Industry
  • Effective duration: by 31/10/2014.
  • Scope and range of operation. 

    + Consulting for preparation of investment projects on hydroelectric plants with max. installation capacity of 100MW. Place of operation: Nationwide
    + Consulting for design and bidding for projects regarding hydroelectric plants with max. installation capacity of 30MW. Place of operation: Nationwide
    + Consulting for preparation of investment projects, design, bidding for power transmission line and power station with max. installation capcity of 110KV. Place of operation: Nationwide
    + Consulting for supervision, execution of hydroelectric plants with max. installation capacity of 30MW. Place of operation: Nationwide
    + Consulting for supervision, execution of hydroelectric plants with max. installation capacity of 110KV. Place of operation: Nationwide 


     

 

Ngày đăng: 24/12/2017

Permit on power operation

Bài viết liên quan


Đối tác